Bathroom remodel Columbia MD

While participating in the Home Show in Howard County, we were approached by a couple who were impressed by the personal attention and design suggestions that we gave them. Soon afterwards they asked us to help remodel their master bathroom and hall bathroom. Apart from fixtures, both bathrooms desperately needed new tiles on the walls and floors. We did not change the layout, but suggested a totally new design for both rooms, updating styles and colors. We completed this project in a little over three weeks.

Bathroom remodel Kensington MD

This client contacted us through Home Advisor concerning a master bathroom and hall bathroom remodeling project. Both rooms had dated tiling and old fixtures. We suggested replacing the master bathroom tub with a shower and installing a tub in the hall bathroom. All the fixtures and tiles were replaced. We completed the renovation in three and half weeks, and the client was delighted with the result.